WEBSITE IS UNDER CONSTRUCTION!

      HELP CREATE THE
DFR&RMRR BY DONATING VIA

   
         
HOME PAGE
 
 
NEWS OF THE WORLD
 
 
 
 
 

MORE INFO
COMING
SOON!

 
Building Construction
 
 
Old 501c3 Info
 
 
 
 
 
 
Trademarks
 
 



Click On Track Plans To Enlarge

  Main Level   Lower Level   Upper Level  
       

Statistics

Room Size 40' x30'
Layout on 3 levels
Lower Level 24"
Main Level 36"
Upper Level 53"
Ceiling Height 96"
Around The Walls (No Windows)
Entry Via Stairs In The Middle
Dimmable LED Lighting

Two Helix's
233 Turnouts Remote Control
TBA Feet Of Mainline Track
32" Minimum Radius
Box Grid Sections Max 12' Long
Cork over 1/2" plywood
OR
Cork over 1/2" Plywood and Homosote

Layout is designed for easy dismantling to be
removed via stairs to allow salvage and
reassembly in another location.

Digitax DCC
JMRI Computer Software

Layout can be run via hand held throttles
or via computer control in "show" mode

16 Camera Video Monitoring Of Hidden Areas

Areas Modeled
Selective Compression Modeling

Denver Union Station
Joint Line / Palmer Lake
Royal Gorge
Denver North Yard / 40th Ave Yard
Commerce City
Coors Brewing
Moffat Road
Moffat Tunnel
Winter Park
Dotsero
Glenwood Canyon
Six Flags Elitch Gardens

Staging areas for:
Kansas City, MO / Cheyenne, WY (Lower Level)
Salt Lake City (Upper Level)


More Info Coming Soon
 

 

Copyright Miniature World of Trains / Denver, Front Range & Rocky Mountain Railroad / DFR&RMRR / Frank Ruby 2023

Copyright / Disclaimer Info